Mon 18 Feb 2008
Volunteers got together on Friday morning to improve the drainage of one of the paths in Penygroes woods. Stone spread before the Boxing Day walk had washed down into a gully. This was dug out and a pipe put in. a drainage pipe was then laid in stone along the side of the path. Future work will include drains across the path to keep it drier underfoot.
Many thanks to Mark, Ifor and John who worked really hard on a difficult stretch of path.
Leave a Reply
You must be logged in to post a comment.